1. Mainpage
  2. Metal insulation fixing MBA 8x170 mm - cardboard box - 250 pcs.

Metal insulation fixing MBA 8x170 mm - cardboard box - 250 pcs.

Universal
Outlet

MBA-08170

5906675049847

Fire-resistant metal insulation fixing

Define product parameters:

Material type
Length
Packaging and quantity
Weight and bulk packaging
  • Unit pack

    250.00 pcs.7.33 kg

  • Bulk pack

    250.00 pcs.7.33 kg

  • Pallet

    9000.00 pcs.

We will prepare this product for you after you add it to your cart and place your order. The estimated lead time is 21 days

Features

Fire-resistant metal insulation fixing

  • Accessory spreader plate, MKC-SS (85mm diameter) also available for installation of soft insulation materials such as mineral wool.
  • Metal facade fixing, recommended for use when fire resistance (F120) is a requirement.
  • Extensive dimensional range allows anchorage of insulation boards up to 250mm thick.
  • Fast and simple hammer-set installation reduces working times.
  • Stainless steel material for high corrosion resistance.

Product video

R-MBA: montaż zagłębiony w wełnie mineralnej

R-MBA: montaż powierzchniowy w wełnie mineralnej

Krok po kroku: jak montować kołki fasadowe z trzpieniem wbijanym

Substrates

Concrete C20/25-C50/60 (A)

Concrete C20/25-C50/60 (A)

Solid brick (B)

Solid brick (B)

Solid sand-lime brick (B)

Solid sand-lime brick (B)

Ceramic hollow block

Ceramic hollow block

Aerated concrete

Aerated concrete

Aerated concrete block (D)

Aerated concrete block (D)

Hollow sand-lime brick ≥ 15MPa

Hollow sand-lime brick ≥ 15MPa

Approved surfaces

Applications

Facades - thermal insulation systems

Full list of variations

Material type
Length
Packaging and quantity
Index
EAN
Catalog price for pack. net

Substitutes

Installation guide

Installation manual

Installation step by step

1

Drill hole to the required diameter and depth for rebar size being usee

2

Blow out dust at least 3 times with a hand pump.

3

Gently drive the MBA steel connector (with MKI plate) into the hole until the connector is anchored to the correct depth.

4

Correctly installed steel facade fixing.

5

Cut the hole in insulation board.

6

Drill a hole of appropriate diameter and depth.

7

Clean drilled hole 3 times.

8

Gently drive the steel dowel into the hole until the correct anchorage depth for the fastener is achieved. For soft substrates, use the MKC 85 mm steel washer.

9

Insert cap into countersunk hole in insulation board following installation of the facade fixing.

10

Correctly installed steel facade fixing.

Approvals and publications

Technical library

(3)

Technical assessments(1)

ITB_KOT_2018_0721wydanie5

ITB-KOT-2018/0721wydanie5

Certificates(1)

020_UWB_0702_Z

020-UWB-0702/Z

Documents(1)

KDWU_2018_0721_6_MBA_FACADE_FIXINGS_EN_1_

Catalogues and product cards

(5)

Product cards(2)

Product card

Product card

Catalogues(3)

Catalogue Offer (overview) - EN

Specification Design Guide

General Catalogue EN - PDF

Stay up to date

Sign up for our newsletter and don't miss:

Information

on our products and services

News

on the offering and latest promotions

Reports

on events, trade shows and industry conferences

© 2026 Koelner Rawlplug IP