Hero Image

Kariba Dam

Rzeka Zambezi, Zambia

Building details

Building start date
2019
Investor
Mart Solutions, Razel Bec
Designer
Razel-bec
Localization
Rzeka Zambezi, Zambia
Type of object
Industrial Facility

Kariba Dam – a monumental structure on the Zambezi River modernized with Rawlplug products!

Kariba Dam, spanning the Zambezi River between Zambia and Zimbabwe, is one of the largest hydroelectric dams in the world. It plays a crucial role in providing electricity to millions of residents, making it one of the most vital infrastructure elements in the region.

Impressive scale and energy potential

Standing 128 meters high and 579 meters long, Kariba Dam is a colossal engineering achievement. Its hydroelectric power station generates 1,626 megawatts of electricity, producing 6,400 gigawatt-hours annually.

A cross-border collaboration

Each country operates its own power station – Zambia on the northern bank and Zimbabwe on the southern bank. This joint management makes Kariba Dam a strategic point of cooperation, ensuring a reliable power supply for millions of people in the region.

Rawlplug solutions in the modernization of Kariba Dam

During the modernization process, Rawlplug anchoring solutions were applied to reinforce critical structural elements of the dam.

  • R-KER-II-400 hybrid chemical anchor – chosen for high strength and adaptability, this anchor was ideal for demanding concrete applications under varied environmental conditions.
  • R-KEX-II chemical anchors – with exceptional resistance to dynamic loads and compatibility with wet and water-submerged substrates, these anchors were essential for hydrotechnical applications.

Threaded rods, used in combination with chemical anchors, ensured structural stability and precise installation, meeting the strict technical requirements of this monumental project.

*The name of the facility may be a registered trademark of third parties and is not the property of Rawlplug’s publisher.

Related products

kariba-dam
Epoxy bonded anchor R-KEX-II 3:1 - plastic cartouche - 600 ml

R-KEX-II-600

Epoxy bonded anchor R-KEX-II 3:1 - plastic cartouche - 600 ml

SEE PRODUCT
Hybrid bonded anchor R-KER-II standard - plastic cartouche - 400 ml

R-KER-II-400

Hybrid bonded anchor R-KER-II standard - plastic cartouche - 400 ml

SEE PRODUCT
Metric threaded rod, hexagonal head, steel class 5.8, hot dip galvanized STUDS 24x300mm - cardboard box - 5 pcs.

R-STUDS-24300-HDG

Metric threaded rod, hexagonal head, steel class 5.8, hot dip galvanized STUDS 24x300mm - cardboard box - 5 pcs.

SEE PRODUCT

Gallery

Kariba Dam

Localization

Rzeka Zambezi

Zambia

Other investments

Kariba Dam

Kariba Dam

Rzeka Zambezi, Zambia

King Abdulaziz International Airport

King Abdulaziz International Airport

Dżudda, Saudi Arabia

Stay up to date

Sign up for our newsletter and don't miss:

Information

on our products and services

News

on the offering and latest promotions

Reports

on events, trade shows and industry conferences

© 2025 Koelner Rawlplug IP