Hero Image

Woodlands Health Campus

Singapore, Singapore

Building details

Building start date
2014
Investor
Woodlands Health
Designer
SAA Architects
Localization
Singapore, Singapore
Type of object
Hospital

Woodlands Health Campus

Woodlands Health Campus is currently the largest hospital in Singapore. Astonishing in design, this high-end facility is intended to serve not only the dwellers of the city in a garden, but also – and equally importantly – the planet Earth. It is yet another green investment completed with the use of Rawlplug’s products. We are more than happy to contribute to the development of the construction industry of the future. 

The Woodlands Health Campus construction project is scheduled for completion in 2023. However, individual divisions of the hospital will be commissioned gradually, and the first to be put into operation will be specialist outpatient clinics, while the emergency unit and other hospital wards will start functioning in 2024. From the architectural point of view, an important element of this impressive building is greenery, also conceived as conducive to patients’ recovery. The campus garden is 1.5 ha in surface area, and the entire facility harmoniously blends with the city’s luxuriant vegetation. There will also be gardens on the hospital roof, providing patients with additional space to exercise and relax outdoors.

Woodlands Health Campus represent a completely novel approach not only to health care but also to construction engineering. A vast number of technologically advanced solutions have been envisaged for the facility, making the hospital complex construction sustainable and environment-friendly. The solar panels to be installed on the roof will cover an area of more than 2 thousand square metres, enabling electric energy consumption to be reduced by as much as 30 per cent (compared to health care facilities of similar size). The hospital operations will largely be automated, making it possible to save the personnel’s working time.

As many as five products from Rawlplug have been used in the construction of Woodlands Health Campus:

  • R-KEX-II epoxy resin,
  • R-XPT and R-XPTIIA4 throughbolts, the latter made of stainless steel,
  • RT-MAXA series drill bits,
  • Rebardrill SDS plus drill bits.

Woodlands Health Campus is an epitome of the construction engineering of the future, based on adequately selected materials, energy-saving solutions, and optimisation of production costs. We coulnd’t be prouder of Rawlplug’s contribution which makes such impressive building projects possible.

The name of the facility may be a registered trademark of third parties and is not the property of the publisher Rawlplug.

Related products

woodlands-health-campus
Epoxy bonded anchor R-KEX-II 3:1 - plastic cartouche - 600 ml

R-KEX-II-600

Epoxy bonded anchor R-KEX-II 3:1 - plastic cartouche - 600 ml

SEE PRODUCT
Stainless steel throughbolt- R-XPT-II-A4 10x95  mm - cardboard box - 50 pcs.

R-XPTIIA4-10095/15

Stainless steel throughbolt- R-XPT-II-A4 10x95 mm - cardboard box - 50 pcs.

SEE PRODUCT
Rebardrill SDS Plus drill bits 8x100x160 mm - plastic hanger - 1 pc.

RT-SDSR-8/160

Rebardrill SDS Plus drill bits 8x100x160 mm - plastic hanger - 1 pc.

SEE PRODUCT
Flat chisel SDS MAX 50x360 mm - plastic hanger - 1 pc.

RT-MAXA-FT-50-360

Flat chisel SDS MAX 50x360 mm - plastic hanger - 1 pc.

SEE PRODUCT

Localization

Singapore

Singapore

Other investments

Woodlands Health Campus

Woodlands Health Campus

Singapore, Singapore

Samsung SDI factory in Hungary

Samsung SDI factory in Hungary

Göd, Hungary

Stay up to date

Sign up for our newsletter and don't miss:

Information

on our products and services

News

on the offering and latest promotions

Reports

on events, trade shows and industry conferences

© 2025 Koelner Rawlplug IP